Home Tags Electricity

Tag: electricity

Balluku meets OSHEE heads on illegal electricity connections

TIRANA, November 22 /ATA/ Minister of Infrastructure and Energy Belinda Balluku held today a meeting with the regional heads of the Albanian Power Distribution...

Infrastructure and energy, projects to be implemented through budget 2022

TIRANA, Oct.24/ATA/ The Llogara Tunnel, the construction of the bypass of Tirana, Gjirokastra and the financing of some lots of the outer Ring of...

Daily electricity generation at Drini River cascade is estimated at 11700...

TIRANA, October 12 /ATA/ Albanian Power Corporation (KESH) reported today that the water inflows to the Drini River cascade have dropped to 126 m3...

Albania’s gross electricity exports rise 3.3 times/ public hydropower plants accounted...

TIRANA, May 21 /ATA/ - Net domestic electricity production rose 2.2 times to 3.344 GWh in first quarter of 2021 from 1.546 GWh during...

Daily electricity production in Drini River cascade is estimated at about...

TIRANA, April 25 /ATA/ Albanian Electricity Corporation (KESH) informed today that rainfall in recent days has increased inflows into the Drini River cascade in...

Drini River cascade/ Inflows amount to 370 m3/s and daily production...

TIRANA, March 29 /ATA/ The Albanian Electric Power Corporation (KESH) informed today that the inflows in the Drini Cascade are estimated at 370 m3...

Foreign investments/ Electricity, gas and water supply lead with 260 million...

TIRANA, March 26 /ATA/ Foreign investments in the sectors of "Electricity, gas and water supply", lead with 260 million Euros, in the total inflows...

We eliminated electricity aforfe invoicing of households, as we also made...

TIRANA, March 18/ATA/ Prime Minister Edi Rama stated today that since 2016, it is removed the aforfe invoicing of the households (usage assumption), which...

Inflows in Drin River cascade increase; daily electricity production hits 24...

TIRANA, February 8/ATA/ Albanian Electric Power Corporation (KESH) informed today that inflows in the Drin River cascade have increased due to the rains reaching...

Balluku at Koman hydropower plant: Increased electricity production and no floods

TIRANA,  February 5 /ATA/- The situation created by heavy rainfall at the Koman hydropower plant has been managed very well, increasing production and managing...