TIRANA, Aug 9 /ATA/- The Albanian Road Authority has taken the measures to repair on time the damaged parts on the Plug-Saver road axis.
Road segment “Plug Roundabout – Saver Roundabout”, is part of the Rrogozhinë-Kolonja project based on performance and result for road safety.
In the framework of the Result- Based Maintenance and Road Safety project, the ARA intervened about a month ago in the Rrogozhina-Kolonja axis for lighting of 4 roundabouts (Cerme, Grabian, Plug, Saver).
This has made it possible for the road heading to the coast to be more lit, safer and up to the standards.
/sm/










