Tag: Drin cascade
Power Corporation: Albania’s daily output at Drin cascade reaches 12,700 MWh
TIRANA, Jan 8 /ATA/ - Recent rainfall has raised reservoir levels, improving the production capacity of the main hydropower plants, Albania’s state-owned power producer...
Water inflows into three major dams on Drin River cascade rises...
TIRANA, Nov 6 /ATA/ - Water inflows into the main dams on the Drin River cascade slightly increased after rains that swept Albania a...
Heavy rainfall increase inflow to main dams, daily production at HPPs...
TIRANA, Sept 17 /ATA/ - Heavy rainfall over the past 24 hours has significantly increased inflows to the major dams of three main hydropower...
Power Corporation: Electricity reserve at Drin River cascade estimated at 541.6...
TIRANA, Aug 29 /ATA/ - The Albanian Power Corporation (KESH) said Monday that the combined daily electricity production at the three main hydropower plants...
Drin River cascade/ Daily power generation over 12.000 MWh
TIRANA, Aug 1 /ATA/ - Albanian Power Corporation (KESH) reported on Monday that the water inflows to the Drini River cascade have dropped to...










