TIRANA, Jan 6 /ATA/ Amid the rising water levels, controlled discharges have started at the Koman and Vau i Dejës Hydro Power Plants in the Drin cascade.
Prime Minister Edi Rama stated today that “in response to rising water levels in the reservoirs a total of 700 m³/second is being discharged at the moment, in addition to the power generation, with these releases being closely monitored and managed by the hydropower plant specialists.”
Rama highlighted that the Shkodra municipality is maintaining constant coordination with KESH to manage the situation and mitigate any potential risks to the areas under the municipality’s jurisdiction.
According to the Prime Minister, “up to this point, no issues have been identified.”
/m.m/a.f/r.e/sm/
Home Flash News










