11.7 C
Tirana
19-10-26
Home Actuality

Rama: Work on Tushemisht promenade is underway, road to Customs is completed

TIRANA, December 2/ATA/ Prime Minister Edi Rama wrote in a post in the social media today that the work on construction of Tushemisht promenade in Pogradec is underway while the road connecting Tushemisht to the Customs has been completed.

Prime Minister Edi Rama shared in the social media photos from the works for implementation of this project.

This project, which reflects the commitment to sustainable and nature-friendly development, integrates sustainable tourism in harmony with the conservation rules of this natural park.

Drilon-Tushemisht is located in a small geographical space, where some of the pearls of Albanian nature are beautifully intertwined, such as: the Drilon springs, Lake Pogradec, characteristic houses of the area, narrow passageways and picturesque landscapes, which create a wonderful oasis with numerous opportunities for the development of tourism in the area.

This project allows visitors not only to walk along the Drilon promenade, but also, through mainly pedestrian paths to reach the Drilon springs and Tushemisht. Every intervention has been carried out with environmentally friendly methods, protecting biodiversity. /a.f/r.e/p.s./

 

Previous articleFestive atmosphere in capital, Christmas tree lit up in “Skanderbeg” Square
Next articleBerisha pledges to increase average wage to 1200 euros, says Open Balkan destroyed thousands of Albanian farms