TIRANA, November 16/ATA/-The work is pressing ahead at the Llogara tunnel.
Prime Minister Edi Rama published photos in the social media of the works at the Llogara tunnel.
Rama wrote that the works are focused on the final concreting of this tunnel and the volume of works done has reached 70% of the entire length of the tunnel.
The prime minister emphasized that the emergency tunnel has also been opened while there is work underway even on the security elements./p.s./










