21.5 C
Tirana
28-10-21
Home Tags Tunnel

Tag: tunnel

Peleshi from Thirra in Kukës: Kalimash tunnel in full function, but...

TIRANA, August 10 /ATA/ The fire near the Kalimash tunnel has been extinguished, while two helicopters are working to extinguish the fire in Maja...

Fire in Kalimash tunnel is brought under control

TIRANA, August 10/ATA/-The fire in the area above the Kalimashi tunnel has been brought under control thanks to the efforts made by numerous firefighters. "The...

Skërfica tunnel along Kardhiq-Delvinë road opens

TIRANA, July 31/ATA/ The Skërfica tunnel, 1316 meters long, is located along the strategic Kardhiq-Delvinë road, designed for development of tourism on the south...

Arbri Road, works currently focused on asphalt layers and opening of...

TIRANA, July 28 /ATA/ Arbri Road, one of the largest infrastructure projects and a complex engineering work that is being built in our country,...

50% of works in Skërfica tunnel are completed/Travel distance from Tirana...

TIRANA, June 30 /ATA/ The Albanian Road Authority informed today that the works for building of Skërfica tunnel on Kardhiq-Delvinë road axis have been...

International competition for building of Llogara tunnel re-opens

TIRANA, June 24/ATA/ The Ministry of Infrastructure and Energy reopened the international competition for the Llogara tunnel, a work which is in line to...

Kardhiq–Delvinë road/Hardest work in Skërfica tunnel is already done

TIRANA, May 27/ATA/The work on building Kardhiq–Delvinë road, 16 km long, is going ahead at a high pace. The road in the South of the...

Historic moment/We are coming out of pandemics tunnel faster than more...

TIRANA, April 15/ATA/ Prime Minister Edi Rama stated today that we are at a historic moment, just about to come out of the pandemic...

Movement of vehicles at “Shqiponja” Square in Tirana entrance/ Balluku: Another...

TIRANA, March 31/ATA/ At the new entrance of Tirana (former “Shqiponja” Square) another tunnel for the movement of vehicles has been opened, further easing...

Tunnel number 4 at “Shqiponja” junction is opened for movement of...

TIRANA, March 16/ATA/ – Tunnel number 4 at the "Shqiponja" junction is opened for the movement of vehicles. Through it, there will move the vehicles...