TIRANA, Jan.18 /ATA/- The Albania’s Minister of Infrastructure and Energy, Belinda Balluku stated on Monday that the working groups of the Electricity Distribution System Operator (OSSH) are on standby to detect a fault in a power system.
In her remarks, Minister Balluku said that, thanks to the strong commitment of the brigade staff of the Electricity Distribution System Operator the power system has been restored quickly and effectively in the tourist area of Valbona, in Tropoja.
“Currently, work is underway on the repair of the 40 km long transmission line in Kukës, broken down due to heavy snowfall,” Minister Balluku said. //a.i/










