15.4 C
Tirana
19-10-26
Home Flash News

Breathing space for city, intensive works on Bajram Curri’s ring road

TIRANA, Nov 20 /ATA/ – The second phase of works on implementation of the project “Ring Road of the City” in Bajram Curri is ongoing, a project won in the follow-up to an intensive cooperation between the Municipality of Tropoja and Albanian Development Fund.

The project is underway in the middle of “Partizani” neighborhood, from Hotel-Restaurant “Real” to the Palace of Culture. The works consist in layout and asphalting this road axis, constructing sidewalks, arranging waterways and street lighting.

The rest entails the layout of the block of Dardania neighborhood, the block between the two main streets “Harry Bajraktari” and “Mic Sokoli”, from PTT, Fierza station to the junction of Dragobia, the layout and extension of “Ram Sadria” street up to “ Halil 1 ”fuel station.

This project includes works on surface layer, greenery, sidewalk arrangement, street lighting, playgrounds for children and parking lots, giving the city of Bajram Curri more breathing space and charm.
/a.a/ j.p/sm/

Previous articleSpecial law on Tirana/ Veliaj: We have very good templates
Next articleDvorani: I adhere to Constitution and law, President’s charge unsubstantiated