<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>outage &#8211; Albanian  Telegraphic  Agency.</title>
	<atom:link href="https://en.ata.gov.al/tag/outage/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.ata.gov.al</link>
	<description>News Agency</description>
	<lastBuildDate>Tue, 09 Jan 2024 20:28:39 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Bad weather power outage, electricity utility restores energy supply in Rexhepaj</title>
		<link>https://en.ata.gov.al/2024/01/09/bad-weather-power-outage-electricity-utility-restores-energy-supply-in-rexhepaj/</link>
					<comments>https://en.ata.gov.al/2024/01/09/bad-weather-power-outage-electricity-utility-restores-energy-supply-in-rexhepaj/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Tue, 09 Jan 2024 20:28:39 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[energy]]></category>
		<category><![CDATA[Kukes]]></category>
		<category><![CDATA[outage]]></category>
		<guid isPermaLink="false">https://en.ata.gov.al/?p=224472</guid>

					<description><![CDATA[TIRANA, January 9 /ATA/ The work group set up by the Electricity Power Distribution System Operator (OSHEE) has managed to repair the power outage caused by bad weather in the energy network in Rexhepaj of the North-eastern region of Kukës, restoring electricity to the local residents of this area. The electricity utility said that the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, January 9 /ATA/ The work group set up by the Electricity Power Distribution System Operator (OSHEE) has managed to repair the power outage caused by bad weather in the energy network in Rexhepaj of the North-eastern region of Kukës, restoring electricity to the local residents of this area.</p>
<p>The electricity utility said that the technicians worked in Rexhepaj, in snowy weather conditions, and restored electricity to the medium voltage network, which supplies energy to this area.</p>
<p>In recent days, our country has been affected by a weather with low temperatures and snow, mainly in the northern areas of the country.</p>
<p>This difficult weather situation has created problems in damaging power lines in some areas. But, despite the difficult weather conditions, the OSHEE teams are on alert on the ground and have intervened to repair outages and normalize electricity supply in every area that appears necessary. /p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2024/01/09/bad-weather-power-outage-electricity-utility-restores-energy-supply-in-rexhepaj/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>OSHEE: Over 70% of power outages because of bad weather are eliminated</title>
		<link>https://en.ata.gov.al/2023/01/19/oshee-over-70-of-power-outages-because-of-bad-weather-are-eliminated/</link>
					<comments>https://en.ata.gov.al/2023/01/19/oshee-over-70-of-power-outages-because-of-bad-weather-are-eliminated/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Thu, 19 Jan 2023 17:52:13 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[outage]]></category>
		<category><![CDATA[weather]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=197245</guid>

					<description><![CDATA[TIRANA, January 19/ATA/ As a result of the bad weather, with strong wind and heavy rain throughout the country, there has been affected the electricity supply in several areas. The Electricity Distribution Operator (OSHEE) reported that by noon its emergency teams had succeeded to repair over 70% of the power outage. The most affected areas [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, January 19/ATA/ As a result of the bad weather, with strong wind and heavy rain throughout the country, there has been affected the electricity supply in several areas.</p>
<p>The Electricity Distribution Operator (OSHEE) reported that by noon its emergency teams had succeeded to repair over 70% of the power outage.</p>
<p>The most affected areas with power outage are Gjirokastra, Shkodra and Burrel regions, mainly remote rural and mountainous areas.</p>
<p>&#8220;The difficult terrain in which the damaged lines are located makes it hard for the teams. Despite the rain, employees from the 11 affiliated branches of the OSHEE are on the ground to repair defects and restore power to all subscribers&#8221;, said the OSHEE. /gj.m/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2023/01/19/oshee-over-70-of-power-outages-because-of-bad-weather-are-eliminated/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Distribution System Operator to provide a final solution to power outage in Gjirokastra</title>
		<link>https://en.ata.gov.al/2021/12/13/distribution-system-operator-to-provide-a-final-solution-to-power-outage-in-gjirokastra/</link>
					<comments>https://en.ata.gov.al/2021/12/13/distribution-system-operator-to-provide-a-final-solution-to-power-outage-in-gjirokastra/#respond</comments>
		
		<dc:creator><![CDATA[Atila Kota]]></dc:creator>
		<pubDate>Mon, 13 Dec 2021 17:14:52 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Gjorakstra]]></category>
		<category><![CDATA[outage]]></category>
		<category><![CDATA[power supply]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=168267</guid>

					<description><![CDATA[TIRANA, Dec. 13/ATA/ After more than 10 hours of intensive on-site work by the brigades of the Electricity Power Distribution System Operator (OSHEE) of the High Voltage unit in Gjirokastra, the Gjirokastra 2 &#8211; Grapsh line has been put into operation. Following the work of the on-site team, it became possible to provide power supply to [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Dec. 13/ATA/ After more than 10 hours of intensive on-site work by the brigades of the Electricity Power Distribution System Operator (OSHEE) of the High Voltage unit in Gjirokastra, the Gjirokastra 2 &#8211; Grapsh line has been put into operation.</p>
<p>Following the work of the on-site team, it became possible to provide power supply to Grapsh substation through a provisional solution.</p>
<p>The Distribution System Operator, following the work processes, is working on a final solution to the power outage in the Gjirokastra 2 &#8211; Grapsh line, which requires preparatory, civil and constructive work, expected to be completed within this week. //a.i/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/12/13/distribution-system-operator-to-provide-a-final-solution-to-power-outage-in-gjirokastra/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
