<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>HPP &#8211; Albanian  Telegraphic  Agency.</title>
	<atom:link href="https://en.ata.gov.al/tag/hpp/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.ata.gov.al</link>
	<description>News Agency</description>
	<lastBuildDate>Sat, 02 Oct 2021 12:10:56 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Balluku: Skavica hydropower plant to increase electricity production capacity and ensures protection from floods</title>
		<link>https://en.ata.gov.al/2021/10/02/balluku-skavica-hydropower-plant-to-increase-electricity-production-capacity-and-ensures-protection-from-floods/</link>
					<comments>https://en.ata.gov.al/2021/10/02/balluku-skavica-hydropower-plant-to-increase-electricity-production-capacity-and-ensures-protection-from-floods/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Sat, 02 Oct 2021 12:09:34 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Balluku]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[skavica]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=162140</guid>

					<description><![CDATA[TIRANA, October 2 /ATA/ Minister of Infrastructure and Energy Belinda Balluku and the U.S. Ambassador in Tirana Yuri Kim were today in the area where Skavica hydropower plant will be built and where work has started for the design of this project so important for Albania. HPP Skavica is the fourth part of the Drini [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, October 2 /ATA/ Minister of Infrastructure and Energy Belinda Balluku and the U.S. Ambassador in Tirana Yuri Kim were today in the area where Skavica hydropower plant will be built and where work has started for the design of this project so important for Albania.</p>
<p>HPP Skavica is the fourth part of the Drini cascade which increases energy security, increases production capacity and ensures flood protection, contributes significantly to the transformation of Albania into a net exporter of electricity.</p>
<p>Balluku said that, &#8220;Skavica HPP is a dream of all Albanians and today we are here to materialize what was just a dream for Albanians.&#8221;</p>
<p>Balluku said that, &#8220;This will not be just a work of infrastructure, but by building Skavica in this area, we seek to achieve some parameters related to energy security.&#8221;</p>
<p>According to her, &#8220;Energy security is the core of this important project.&#8221;</p>
<p>&#8220;Albania has long been trying to increase the capacity of the domestic market by becoming a country exporter of renewable energy and not an importer with high prices that create problems in the state budget,&#8221; she said.</p>
<p>Balluku also stressed that, &#8220;This is a project with social impact. The area where it will be built will receive all the attention and development of infrastructure and there will be other development opportunities. With the completion of this HPP, a new era begins for the area of ​​Kukës and Dibra, as they can be developed from the tourist point of view due to the infrastructure that will be built in support of the HPP &#8220;, she said.</p>
<p>According to Balluku, the access roads that have been created to help the project are now welcomed by the community.</p>
<p>Balluku stressed that &#8220;Bechtel &#8216;company has been selected for its experience to carefully address the social impact of critical infrastructure during the construction and operation of this HPP.&#8221;/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/10/02/balluku-skavica-hydropower-plant-to-increase-electricity-production-capacity-and-ensures-protection-from-floods/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Building of Skavica HPP/ Balluku: One of most important investments in Albanian hydro-energy sector</title>
		<link>https://en.ata.gov.al/2021/03/19/building-of-skavica-hpp-balluku-one-of-most-important-investments-in-albanian-hydro-energy-sector/</link>
					<comments>https://en.ata.gov.al/2021/03/19/building-of-skavica-hpp-balluku-one-of-most-important-investments-in-albanian-hydro-energy-sector/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Fri, 19 Mar 2021 18:15:15 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Balluku]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[skavica]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=137764</guid>

					<description><![CDATA[TIRANA, March 19 /ATA/ The Parliamentary Committee on Economy and Finance approved today a special procedure for negotiating and executing the contract with the strategic partner &#8220;Bechtel Internacional&#8221; Inc., for the design and construction of the Skavica hydropower plant. In the framework of the Memorandum of Economic Cooperation for Projects and Purchases, between the Albanian [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, March 19 /ATA/ The Parliamentary Committee on Economy and Finance approved today a special procedure for negotiating and executing the contract with the strategic partner &#8220;Bechtel Internacional&#8221; Inc., for the design and construction of the Skavica hydropower plant.</p>
<p>In the framework of the Memorandum of Economic Cooperation for Projects and Purchases, between the Albanian government and the US government, in early October 2020, the Minister of Infrastructure and Energy Belinda Balluku and the representative of the company &#8220;Bechtel&#8221; Justin Siberell, president of Europe and the Middle East region, in the presence of Prime Minister Edi Rama and the United States Under Secretary of State for Economic Development, Energy and Environment Keith Krach, signed a Memorandum of Understanding on Cooperation in relation to the Skavica HPP Project.</p>
<p>The signed document emphasizes the importance of the HPP Skavica Project, as a project of national interest, which will enable Albania to establish full independence from energy imports and will position our country as an energy center for the region.</p>
<p>Minister Balluku said to the Committee that Skavica hydropower plant is one of the most important investments in the Albanian hydropower sector.</p>
<p>&#8220;Skavica will have a special importance not only for energy production, but for the optimization it makes to the Drini cascade, increasing the production capacity of the three existing HPPs in the cascade and solving once and for all the problem of floods in the field of NënShkodra &#8220;, stated the minister.</p>
<p>The contract is divided into two phases and will be signed by the Albanian Power Corporation in the capacity of contracting authority while the Ministry of Infrastructure and Energy will assist the whole process.</p>
<p>Albania imports about 100 million Euros of electricity per year and the construction of Skavica realizes the reduction by 50 million dollars of energy imports./r.e/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/03/19/building-of-skavica-hpp-balluku-one-of-most-important-investments-in-albanian-hydro-energy-sector/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Drini cascade/KESH: Water flows drop to 490 m3/s, daily production meets domestic demand for electricity</title>
		<link>https://en.ata.gov.al/2021/02/19/drini-cascade-kesh-water-flows-drop-to-490-m3-s-daily-production-meets-domestic-demand-for-electricity/</link>
					<comments>https://en.ata.gov.al/2021/02/19/drini-cascade-kesh-water-flows-drop-to-490-m3-s-daily-production-meets-domestic-demand-for-electricity/#respond</comments>
		
		<dc:creator><![CDATA[Sonila Mehmeti]]></dc:creator>
		<pubDate>Fri, 19 Feb 2021 10:04:32 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Flash News]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[discharges]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[level]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=134422</guid>

					<description><![CDATA[TIRANA, Feb 19 /ATA/- Albanian Power Corporation (KESH) reported on Friday that the water flows in the Drini River cascade have dropped to 490 m3 / s, while production continues at maximum capacity. According to KESH, the three HPPs on the Drini cascade are carrying out discharges, while discharges via the gates are being carried [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Feb  19 /ATA/- Albanian Power Corporation (KESH) reported on Friday that the water flows in the Drini River cascade have dropped to 490 m3 / s, while production continues at maximum capacity.</p>
<p>According to KESH, the three HPPs on the Drini cascade are carrying out discharges, while discharges via the gates are being carried out only from Vau i Dejës.</p>
<p>Discharges from production and discharge gates are: Fierza HPP &#8211; 490 m3 / s from production, 0 m3 / s discharges from gates, Koman HPP &#8211; 517 m3 / s from production, 0 m3 / s discharges from gates and in Vau Dejës HPP &#8211; 440 m3 / s from production, 100 m3 / s discharges from gates.</p>
<p>KESH informs that the lake levels of the Drini Cascade are: Fierza HPP 294.23 m from max. Quota of 296; Koman HPP 173.02 m from max. Quota of 175.5 m and Vau i Dejës HPP 73.97 m from max. Quota of  76 m).</p>
<p>Regarding the production in the three HPPs, KESH informs that in Fierza HPP it is is 10,650 MWh (daily), in Koman HPP it is  9,939 MWh (daily) and in Vau Dejës HPP, 4,320 MWh (daily).</p>
<p>Total production meets the demand for electricity consumption in the country.<br />
/sm/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/02/19/drini-cascade-kesh-water-flows-drop-to-490-m3-s-daily-production-meets-domestic-demand-for-electricity/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Drini cascade/ Water flows drop to 500 m3/s, daily production goes up to 26 419 MWh</title>
		<link>https://en.ata.gov.al/2021/02/18/drini-cascade-water-flows-drop-to-500-m3-s-daily-production-goes-up-to-26-419-mwh/</link>
					<comments>https://en.ata.gov.al/2021/02/18/drini-cascade-water-flows-drop-to-500-m3-s-daily-production-goes-up-to-26-419-mwh/#respond</comments>
		
		<dc:creator><![CDATA[Sonila Mehmeti]]></dc:creator>
		<pubDate>Thu, 18 Feb 2021 08:35:52 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Flash News]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[discharges]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[production]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=134289</guid>

					<description><![CDATA[TIRANA, Feb 18 /ATA/ Albanian Power Corporation (KESH) informed on Thursday that water flows in the Drin River cascade have dropped to 500 m3 / s, while production continues at maximum capacity. According to KESH, the three HPPs on the Drini cascade are carrying out discharges, while discharges via the gates are carried out from [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Feb  18 /ATA/  Albanian Power Corporation (KESH) informed on Thursday that water flows in the Drin River cascade have dropped to 500 m3 / s, while production continues at maximum capacity.</p>
<p>According to KESH, the three HPPs on the Drini cascade are carrying out discharges, while discharges via the gates are carried out from Vau i Dejës HPP.</p>
<p>Discharges from production and discharge gates are: Fierza HPP &#8211; 470 m3 / s from production, 0 m3 / s discharges from gates. Koman HPP &#8211; 650 m3 / s from production, 0 m3 / s discharges from gates. Vau Dejës HPP &#8211; 450 m3 / s from production, 200 m3 / s discharges from gates.</p>
<p>The water level in the lake of Fierza HPP is 294.33 m, from 296 m the maximum quota, in Koman HPP the water level 172.69 m, from 175.5 m and  Vau i Dejës HPP, 74.03 m, from 76 m the maximum quota.<br />
In Fierza HPP, the daily production is 9 939 MWh, in Koman 12 040 MWh, while in Vau i Dejës HPP is 4 440 MWh.</p>
<p>The total daily production is estimated at 26 419 MWh and meets the entire demand for domestic electricity consumption.</p>
<p>&#8220;KESH will continue to monitor the situation by guaranteeing dam safety, electricity supply to domestic consumers and prevention of  negative impact of discharges on the lowlands of Shkodra,&#8221; same sources say.<br />
e.xh/sm/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/02/18/drini-cascade-water-flows-drop-to-500-m3-s-daily-production-goes-up-to-26-419-mwh/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Rainfall/ Albanian Power Corporation: Discharges from gate of Vau i Dejës HPP at level of  500 m3/s</title>
		<link>https://en.ata.gov.al/2021/01/30/rainfall-albanian-power-corporation-discharges-from-gate-of-vau-i-dejes-hpp-at-level-of-500-m3-s/</link>
					<comments>https://en.ata.gov.al/2021/01/30/rainfall-albanian-power-corporation-discharges-from-gate-of-vau-i-dejes-hpp-at-level-of-500-m3-s/#respond</comments>
		
		<dc:creator><![CDATA[Sonila Mehmeti]]></dc:creator>
		<pubDate>Sat, 30 Jan 2021 08:30:34 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Flash News]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[lake]]></category>
		<category><![CDATA[level]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=132445</guid>

					<description><![CDATA[TIRANA, Jan 30 /ATA/ The Albanian Power Corporation (KESH) is dynamically monitoring the situation in the Drin river cascade amid unstable weather conditions with heavy rainfall and informs that discharges from the gate of Vau i Dejes HPP continue to be constant at 500 m3 / s. According to KESH, the total water inflows are [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Jan  30 /ATA/ The Albanian Power Corporation (KESH) is dynamically monitoring the situation in the Drin river cascade amid unstable weather conditions with heavy rainfall and informs that discharges from the gate of Vau i Dejes HPP continue to be constant at 500 m3 / s.</p>
<p>According to KESH, the total water inflows are 1080 m3 / s.</p>
<p>While the lake level is: Fierza HPP 290.78 m, Koman HPP 172.04 m and Vau i Dejës HPP 73.50 m.</p>
<p>KESH informs that it has taken all the measures to guarantee full dam safety, uninterrupted supply of electricity for domestic consumer and prevention of any impact of water discharges on the lowlands of  Shkodra.<br />
/sm/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/01/30/rainfall-albanian-power-corporation-discharges-from-gate-of-vau-i-dejes-hpp-at-level-of-500-m3-s/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bad weather/ KESH: Total inflows reach 1900 m³/s, water discharges at Vau i Dejes HPP reach 500 m³/s</title>
		<link>https://en.ata.gov.al/2021/01/25/bad-weather-kesh-total-inflows-reach-1900-m%c2%b3-s-water-discharges-at-vau-i-dejes-hpp-reach-500-m%c2%b3-s/</link>
					<comments>https://en.ata.gov.al/2021/01/25/bad-weather-kesh-total-inflows-reach-1900-m%c2%b3-s-water-discharges-at-vau-i-dejes-hpp-reach-500-m%c2%b3-s/#respond</comments>
		
		<dc:creator><![CDATA[Atila Kota]]></dc:creator>
		<pubDate>Mon, 25 Jan 2021 18:00:24 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[KESH]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=131931</guid>

					<description><![CDATA[TIRANA, Jan.25 /ATA/- The Albanian Power Corporation (KESH) has continued monitoring of three HPPs on the Drini cascade while managing to accumulate in the reservoirs of hydropower plants the increased amount of inflows. &#8220;Total flows are 1900 m³/s. The discharges from the gate of the Vau i Dejës HPP are currently 500 m³/s which does [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Jan.25 /ATA/- The Albanian Power Corporation (KESH) has continued monitoring of three HPPs on the Drini cascade while managing to accumulate in the reservoirs of hydropower plants the increased amount of inflows.</p>
<p>&#8220;Total flows are 1900 m³/s. The discharges from the gate of the Vau i Dejës HPP are currently 500 m³/s which does not affect the increase of the water level in the sub areas of Shkodra,” KESH said.</p>
<p>According to the official data published by the Albanian Power Corporation, the level of the lake at the Fierza HPP reaches 289.41 m down from the maximum allowable level of 296 m. At the Koman HPP the level of the lake is 170.38 m, down from the maximum allowable level of 176 m, while at Vau i Dejes HPP, the level of lake is 71.83 m, down from maximum allowable level of 76 m. //a.i/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/01/25/bad-weather-kesh-total-inflows-reach-1900-m%c2%b3-s-water-discharges-at-vau-i-dejes-hpp-reach-500-m%c2%b3-s/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>KESH: Dams safety, total production meets all electricity demand</title>
		<link>https://en.ata.gov.al/2021/01/24/kesh-dams-safety-total-production-meets-all-electricity-demand/</link>
					<comments>https://en.ata.gov.al/2021/01/24/kesh-dams-safety-total-production-meets-all-electricity-demand/#respond</comments>
		
		<dc:creator><![CDATA[Atila Kota]]></dc:creator>
		<pubDate>Sun, 24 Jan 2021 18:00:07 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[KESH]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=131824</guid>

					<description><![CDATA[TIRANA, Jan.24 /ATA/- The Albanian Power Corporation (KESH) is monitoring the rainfall situation by guaranteeing the complete safety of dams, electricity supply to domestic consumers and avoiding the negative impact of water discharges in the sub-areas of Shkodra, the head of KESH, Benet Beci said while publishing the official data related to the monitoring of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Jan.24 /ATA/- The Albanian Power Corporation (KESH) is monitoring the rainfall situation by guaranteeing the complete safety of dams, electricity supply to domestic consumers and avoiding the negative impact of water discharges in the sub-areas of Shkodra, the head of KESH, Benet Beci said while publishing the official data related to the monitoring of three HPPs on the Drini cascade.</p>
<p>According to the official data published by the Albanian Power Corporation, the level of the lake at the Fierza HPP reaches 288.41 mmnd, (max. Quota 296 mmnd); Koman HPP 168.79 mmnd (max. Quota. 175.5 mmnd); Vau i Dejës HPP 71.12 mmnd (max. Quota 76 mmnd).</p>
<p>The power production in the three HPPs is: Fierza HPP with a daily production of 3,900 MWh; Koman HPP with a daily production of 11,900 MWh; Vau i Dejës HPP with a daily production of 4,000 MWh. //a.i/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/01/24/kesh-dams-safety-total-production-meets-all-electricity-demand/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Daily energy production/ KESH: Discharges at Vau i Dejës HPP reach 200 m³/s</title>
		<link>https://en.ata.gov.al/2021/01/22/daily-energy-production-kesh-discharges-at-vau-i-dejes-hpp-reach-200-m%c2%b3-s/</link>
					<comments>https://en.ata.gov.al/2021/01/22/daily-energy-production-kesh-discharges-at-vau-i-dejes-hpp-reach-200-m%c2%b3-s/#respond</comments>
		
		<dc:creator><![CDATA[Atila Kota]]></dc:creator>
		<pubDate>Fri, 22 Jan 2021 17:09:40 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Drini]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[KESH]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=131651</guid>

					<description><![CDATA[TIRANA, Jan.22 /ATA/- The Albanian Power Corporation (KESH) stated on Friday that, the monitoring of three HPPs on the Drini cascade is well underway, while the meteorological services have warned heavy rains during the weekend. Currently, all generation capacities have been put into operation, with a daily production of 26 500 MWH (per day) meeting [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Jan.22 /ATA/- The Albanian Power Corporation (KESH) stated on Friday that, the monitoring of three HPPs on the Drini cascade is well underway, while the meteorological services have warned heavy rains during the weekend.</p>
<p>Currently, all generation capacities have been put into operation, with a daily production of 26 500 MWH (per day) meeting all the electricity needs of the final consumer.</p>
<p>According to the official data published by the Albanian Power Corporation, the level of the lake at the Fierza HPP reaches 287.97 m down from the maximum allowable level of 296 m, at the HPP Koman the level of the lake is 168.55 m, down from the maximum allowable level of 176 m, while at Vau i Dejes HPP, the level of lake is 71.12 m, down from maximum allowable level of 76 m.</p>
<p>According to the last hour data of the Hydro-Meteorological report, the level of discharges at Fierza and Koman HPPs has been completely stopped while discharges at Vau i Dejës HPP reached 200 m³/s. //a.i/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/01/22/daily-energy-production-kesh-discharges-at-vau-i-dejes-hpp-reach-200-m%c2%b3-s/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Daily production from Drini basin 26,500 MWH/ KESH: Level of lake in Vau i Dejës drops to 71.5 m</title>
		<link>https://en.ata.gov.al/2021/01/21/daily-production-from-drini-basin-26500-mwh-kesh-level-of-lake-in-vau-i-dejes-drops-to-71-5-m/</link>
					<comments>https://en.ata.gov.al/2021/01/21/daily-production-from-drini-basin-26500-mwh-kesh-level-of-lake-in-vau-i-dejes-drops-to-71-5-m/#respond</comments>
		
		<dc:creator><![CDATA[Atila Kota]]></dc:creator>
		<pubDate>Thu, 21 Jan 2021 11:12:33 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[HPP]]></category>
		<category><![CDATA[KESH]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=131443</guid>

					<description><![CDATA[TIRANA, Jan.21 /ATA/- The Albanian Power Corporation (KESH) stated on Thursday that, the monitoring of three HPPs on the Drini cascade is well underway, while the meteorological services have warned heavy rains during the weekend. Currently, all generation capacities have been put into operation, with a daily production of 26 500 MWH (per day) meeting [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Jan.21 /ATA/- The Albanian Power Corporation (KESH) stated on Thursday that, the monitoring of three HPPs on the Drini cascade is well underway, while the meteorological services have warned heavy rains during the weekend.</p>
<p>Currently, all generation capacities have been put into operation, with a daily production of 26 500 MWH (per day) meeting all the electricity needs of the final consumer.</p>
<p>According to the official data published by the Albanian Power Corporation, the level of the lake at the Fierza HPP reaches 288.76 m down from the maximum allowable level of 296 m. At the Koman HPP the level of the lake is 170.70 m, down from the maximum allowable level of 176 m, while at Vau i Dejes HPP, the level of lake is 72.14 m, down from maximum allowable level of 76 m.</p>
<p>According to the last hour data of the Hydro-Meteorological report, the level of discharges in Fierza and Koman HPPs has been completely stopped while in HPP of Vau i Dejës, discharges reached 500 m³/s. //a.i/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/01/21/daily-production-from-drini-basin-26500-mwh-kesh-level-of-lake-in-vau-i-dejes-drops-to-71-5-m/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
