<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>HPP-downpower-level &#8211; Albanian  Telegraphic  Agency.</title>
	<atom:link href="https://en.ata.gov.al/tag/hpp-downpower-level/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.ata.gov.al</link>
	<description>News Agency</description>
	<lastBuildDate>Mon, 19 Sep 2022 11:57:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Heavy rainfalls increase cascade inflows, KESH: Daily production goes up to 14.760 MWh</title>
		<link>https://en.ata.gov.al/2022/09/19/heavy-downpour-increase-inflows-kesh-daily-production-goes-up-to-14-760-mwh/</link>
					<comments>https://en.ata.gov.al/2022/09/19/heavy-downpour-increase-inflows-kesh-daily-production-goes-up-to-14-760-mwh/#respond</comments>
		
		<dc:creator><![CDATA[Sonila Mehmeti]]></dc:creator>
		<pubDate>Mon, 19 Sep 2022 10:24:03 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Flash News]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[HPP-downpower-level]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=188175</guid>

					<description><![CDATA[TIRANA, Sept 19 /ATA/ The Albanian Power Corporation (KESH) announces that the torrential showers that swept the country over the weekend have significantly increased the inflows in the Drini cascade. According to KESH, the energy reserve increased by 43 GWh, going up to 483 GWh, from 440 GWh that was on September 15, while the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, Sept  19 /ATA/ The Albanian Power Corporation (KESH) announces that the torrential showers that swept the country over the weekend have significantly increased the inflows in the Drini cascade.</p>
<p>According to KESH, the energy reserve increased by 43 GWh, going up to 483 GWh, from 440 GWh that was on September 15, while the production from the cascade has increased by almost 3 times[ going to 14 760 MWh.</p>
<p>&#8220;Natural flows in the cascade are 260 m3/s. The level of the Fierza HPP lake is 269.48 m, while the maximum quota is 296 m. The level of the Koman HPP lake is 169.64 m, while the maximum quota is 175.5 m. The level of the lake at the Vau de Deja HPP is 73.46 m, while the maximum quota is 76 m,&#8221; according to KESH.</p>
<p>The natural flows in the Fierza HPP are reckoned at 120 m3/s, at the Koman HPP 130 m3/s, while at Vaut i Dejes HPP at 10 m3/s. /j.p/sm/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2022/09/19/heavy-downpour-increase-inflows-kesh-daily-production-goes-up-to-14-760-mwh/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
