<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Drin &#8211; Albanian  Telegraphic  Agency.</title>
	<atom:link href="https://en.ata.gov.al/tag/drin/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.ata.gov.al</link>
	<description>News Agency</description>
	<lastBuildDate>Sun, 25 May 2025 16:13:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Grand Bridge of Kukës, a major infrastructure work along Nation’s Road</title>
		<link>https://en.ata.gov.al/2025/05/25/grand-bridge-of-kukes-a-major-infrastructure-work-along-nations-road/</link>
					<comments>https://en.ata.gov.al/2025/05/25/grand-bridge-of-kukes-a-major-infrastructure-work-along-nations-road/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Sun, 25 May 2025 16:13:43 +0000</pubDate>
				<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[bridge]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[Kukes]]></category>
		<guid isPermaLink="false">https://en.ata.gov.al/?p=265175</guid>

					<description><![CDATA[TIRANA, May 25/ATA/ The Grand Bridge of Kukës, one of the most modern infrastructure works in the country, is now ready to cope with the high tourist flow and road traffic along the National Road, replacing the old bridge built in 1978. Prime Minister Edi Rama shared today in the social media photos of this [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, May 25/ATA/ The Grand Bridge of Kukës, one of the most modern infrastructure works in the country, is now ready to cope with the high tourist flow and road traffic along the National Road, replacing the old bridge built in 1978.</p>
<p>Prime Minister Edi Rama shared today in the social media photos of this new work, which connects the banks of the Drini River in Kukës and which is considered one of the most special and innovative projects in the field of road infrastructure in Albania.</p>
<p>Designed by Italian architect Giorgio Rizzo, the bridge provides a solution to an important connecting node on the national road, significantly easing traffic in this area that until now relied on a structure built over 45 years ago, before the construction of the Fierza dam.</p>
<p>The new bridge was built entirely outside its location and was then positioned through a rare engineering method, floating the structure on water, a special technique that makes this project unique in the region and among the rarest in Europe.</p>
<p>The bridge structure includes two strong concrete foundations on the shores of the lake, while its length is composed of a metal construction with a large arch, without intermediate support legs, ensuring high stability and an impressive architectural appearance.</p>
<p>This project has cost about 40 million euros, including the construction of two access roads, entry and exit.</p>
<p>The Grand Kukës Bridge is expected to have a direct impact on increasing the flow of tourists and facilitating transport along one of the most important national roads, as well as further strengthening the connections between Albania and Kosovo. /r.e/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2025/05/25/grand-bridge-of-kukes-a-major-infrastructure-work-along-nations-road/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Albanian Electric Corporation, a floating photovoltaic plant in Vau i Dejës with 13.8 MW capacity</title>
		<link>https://en.ata.gov.al/2024/06/08/albanian-electric-corporation-a-floating-photovoltaic-plant-in-vau-i-dejes-with-13-8-mw-capacity/</link>
					<comments>https://en.ata.gov.al/2024/06/08/albanian-electric-corporation-a-floating-photovoltaic-plant-in-vau-i-dejes-with-13-8-mw-capacity/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Sat, 08 Jun 2024 07:55:14 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[KESH]]></category>
		<category><![CDATA[plant]]></category>
		<guid isPermaLink="false">https://en.ata.gov.al/?p=236833</guid>

					<description><![CDATA[TIRANA, June 8 /ATA/ The &#8220;SENA Solar Energy of Albania&#8221;  joint stock company, where the Albanian Electric Corporation (KESH) owns 100% of the shares, has submitted to the Ministry of Infrastructure and Energy, the application for construction of a floating photovoltaic plant in Vau i Dejës. The plant will be located in the reservoir of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, June 8 /ATA/ The &#8220;SENA Solar Energy of Albania&#8221;  joint stock company, where the Albanian Electric Corporation (KESH) owns 100% of the shares, has submitted to the Ministry of Infrastructure and Energy, the application for construction of a floating photovoltaic plant in Vau i Dejës.</p>
<p>The plant will be located in the reservoir of the Vau i Dejës hydropower plant and is expected to have an installed capacity of 13.8 MW.</p>
<p>This plant is not the subject of a concession and does not benefit from support measures.</p>
<p>The construction of the floating photovoltaic plant is one of the projects of KESH, in context of diversification of sources of energy production.</p>
<p>KESH currently owns only one solar plant of 5.14 MWp positioned at the Qyrsaq dam, in Vau i Dejës, while the rest of the generation assets include the 3 Hydropower plants of the Drini River Cascade./p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2024/06/08/albanian-electric-corporation-a-floating-photovoltaic-plant-in-vau-i-dejes-with-13-8-mw-capacity/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Rama: KESH teams clean lakes in Drini river cascade, tourist postcard of Albania</title>
		<link>https://en.ata.gov.al/2023/08/10/rama-kesh-teams-clean-lakes-in-drini-river-cascade-tourist-postcard-of-albania/</link>
					<comments>https://en.ata.gov.al/2023/08/10/rama-kesh-teams-clean-lakes-in-drini-river-cascade-tourist-postcard-of-albania/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Thu, 10 Aug 2023 12:33:23 +0000</pubDate>
				<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Tourism]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[KESH]]></category>
		<category><![CDATA[lakes]]></category>
		<guid isPermaLink="false">https://en.ata.gov.al/?p=212190</guid>

					<description><![CDATA[TIRANA, August 10/ATA/ Albanian Power Corporation (KESH) teams are working to clean the lakes in the Drini river cascade, which at the peak of the summer season have become the tourist postcards of Albania. Prime Minister Edi Rama shared photos from this cleaning action in social media today and expressed his thanks for the teams [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, August 10/ATA/ Albanian Power Corporation (KESH) teams are working to clean the lakes in the Drini river cascade, which at the peak of the summer season have become the tourist postcards of Albania.</p>
<p>Prime Minister Edi Rama shared photos from this cleaning action in social media today and expressed his thanks for the teams that work together for a cleaner environment.</p>
<p>The staffs of the three hydropower plants under the administration of KESH are on duty even during August for the cleaning of Lake Koman, where the biggest problem is the flow of the visitors.</p>
<p>The National Plan of thorough Cleaning of Albania started on November 7, 2021 in Vlora and has extended in all the cities of the country. /m.m/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2023/08/10/rama-kesh-teams-clean-lakes-in-drini-river-cascade-tourist-postcard-of-albania/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>KESH: Energy production meets demand for local consumption</title>
		<link>https://en.ata.gov.al/2022/11/21/kesh-energy-production-meets-demand-for-local-consumption/</link>
					<comments>https://en.ata.gov.al/2022/11/21/kesh-energy-production-meets-demand-for-local-consumption/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Mon, 21 Nov 2022 09:08:30 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[consumption]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[energy]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=192879</guid>

					<description><![CDATA[TIRANA, November 21/ATA/ The Albanian Electric Power Corporation (KESH) reported that it is monitoring the water level as well as the flows into the Drini River cascade. According to the data at 10:00, the total natural flows in the cascade are 2895 m3/s, while the discharges from the Vau i Dejes Hydropower gate are 1000 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, November 21/ATA/ The Albanian Electric Power Corporation (KESH) reported that it is monitoring the water level as well as the flows into the Drini River cascade.</p>
<p>According to the data at 10:00, the total natural flows in the cascade are 2895 m3/s, while the discharges from the Vau i Dejes Hydropower gate are 1000 m3/s.</p>
<p>The level of water at Fierza Lake has reached 271.42 mmd, in Koman 173.62 mmd and in Vau i Dejes 75.40 mmd.</p>
<p>&#8220;Cascade energy production fully meets OSHEE/FTL&#8217;s demand for electricity supply for local consumption&#8221;, KESH said./p.s./</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2022/11/21/kesh-energy-production-meets-demand-for-local-consumption/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Archaeological excavations in lower Drin valley</title>
		<link>https://en.ata.gov.al/2022/09/01/archaeological-excavations-in-lower-drin-valley/</link>
					<comments>https://en.ata.gov.al/2022/09/01/archaeological-excavations-in-lower-drin-valley/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Thu, 01 Sep 2022 16:27:54 +0000</pubDate>
				<category><![CDATA[Arts&Culture]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[archaeology]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[excavations]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=186995</guid>

					<description><![CDATA[TIRANA, September 1/ATA/ The Albanian-French mission led by Dr. Etleva Nallbani, CNRS PARIS and Dr. Elvana Metalla, Archaeological Institute, Tirana conducted important archaeological research in the lower Drin valley for more than 1 month. After an intensive work, there has been completed the massive cleaning of the vegetation of the archaeological site; it is carried [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, September 1/ATA/ The Albanian-French mission led by Dr. Etleva Nallbani, CNRS PARIS and Dr. Elvana Metalla, Archaeological Institute, Tirana conducted important archaeological research in the lower Drin valley for more than 1 month.</p>
<p>After an intensive work, there has been completed the massive cleaning of the vegetation of the archaeological site; it is carried out by cooperation of the Shkodër Regional Directorate of Cultural Heritage and the Albanian-French Mission of the &#8220;Drin Valley&#8221; project, directed by archaeologist dr. Nallbani.</p>
<p>This year the mission has been extended to two representative settlements of the early Middle Ages: the medieval city of Sarda, on the island of Shurdhah, and the settlement of Koman.</p>
<p>The study will bring a new step of data on the Arbëria culture, urbanization, development, and displacement of populations, rituals and the stage of development that these settlements had reached.</p>
<p>The lower Drin valley remains an important region of scientific archaeological research in Albania. /r.e/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2022/09/01/archaeological-excavations-in-lower-drin-valley/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Albania’s electricity production from Drini River amounts to 13 thousand MWh</title>
		<link>https://en.ata.gov.al/2022/01/10/albanias-electricity-production-from-drini-river-amounts-to-13-thousand-mwh/</link>
					<comments>https://en.ata.gov.al/2022/01/10/albanias-electricity-production-from-drini-river-amounts-to-13-thousand-mwh/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Mon, 10 Jan 2022 12:43:12 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[river]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=170206</guid>

					<description><![CDATA[TIRANA, January 10/ATA/ Albanian Power Corporation (KESH) reported today that water inflows in the Drini River Cascade have increased, while production is 13,100 MWh. &#8220;Natural inflows in the Cascade are 290 m3 / s. The level of the lake of Fierza HPP is 277.10 m, while the maximum quota is 296 m. The level of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, January 10/ATA/ Albanian Power Corporation (KESH) reported today that water inflows in the Drini River Cascade have increased, while production is 13,100 MWh.</p>
<p>&#8220;Natural inflows in the Cascade are 290 m3 / s. The level of the lake of Fierza HPP is 277.10 m, while the maximum quota is 296 m. The level of the Koman HPP Lake is 172.60 m, while the maximum quota is 175.5 m. The level of the lake in the HPP of Vau i Dejës is 73.69 m, while the maximum quota is 76 m &#8220;, KESH said.</p>
<p>Natural inflows in the HPP of Fierza are calculated 190 m3 / s, in the HPP of Koman 90 m3 / s, while in that of Vau i Dejes, 10 m3 / s</p>
<p>According to data published today by KESH, currently the daily production in the three HPPs of Cascade is estimated at 13100 MWh, while the energy reserve is 678 GWh. /a.a/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2022/01/10/albanias-electricity-production-from-drini-river-amounts-to-13-thousand-mwh/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Electricity production from HPPs on Drini River hits 11 thousand MWh</title>
		<link>https://en.ata.gov.al/2021/12/28/electricity-production-from-hpps-on-drini-river-hits-11-thousand-mwh/</link>
					<comments>https://en.ata.gov.al/2021/12/28/electricity-production-from-hpps-on-drini-river-hits-11-thousand-mwh/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Tue, 28 Dec 2021 08:13:57 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[river]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=169330</guid>

					<description><![CDATA[TIRANA, December 28/ATA/ Albanian Power Corporation (KESH) informed today that water inflows in the Drini Cascade have increased, while production is 11,200 MWh. &#8220;Natural water flows in the Cascade are 885 m3 / s. The level of the lake of Fierza Hydro Power Plant is 273.82 m, while the maximum quota is 296 m. The [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, December 28/ATA/ Albanian Power Corporation (KESH) informed today that water inflows in the Drini Cascade have increased, while production is 11,200 MWh.</p>
<p>&#8220;Natural water flows in the Cascade are 885 m3 / s. The level of the lake of Fierza Hydro Power Plant is 273.82 m, while the maximum quota is 296 m. The level of the lake of Koman HPP is 172.78 m, while the maximum quota is 175.5 m.</p>
<p>The level of the lake in HPP of Vau i Dejës is 74.06 m, while the maximum quota is 76 m &#8220;, said KESH.</p>
<p>Natural flows in the HPP of Fierza are estimated at 470 m3 / s, in the HPP of Koman 390 m3 / s, while in that of Vau i Dejes, 25 m3 /s.</p>
<p>According to data published today by KESH, the daily production in the three HPPs of Cascade is currently estimated at 11200 MWh. /j.p/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/12/28/electricity-production-from-hpps-on-drini-river-hits-11-thousand-mwh/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Albanian Power Corporation: Koman and Vau i Dejës Hydropower stations are producing electricity at full capacity</title>
		<link>https://en.ata.gov.al/2021/12/07/albanian-power-corporation-koman-and-vau-i-dejes-hydropower-stations-are-producing-electricity-at-full-capacity/</link>
					<comments>https://en.ata.gov.al/2021/12/07/albanian-power-corporation-koman-and-vau-i-dejes-hydropower-stations-are-producing-electricity-at-full-capacity/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Tue, 07 Dec 2021 13:38:45 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[electricity]]></category>
		<category><![CDATA[production]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=167825</guid>

					<description><![CDATA[TIRANA, December 7/ATA/ Albanian Power Corporation (KESH) reported today on the hydric situation and natural flows in the Drini River cascade that mark the amount of 1780 m3 / s, while hydropower stations of Koman and Vau i Dejës are producing electricity at full capacity. “The level of the lake in the Fierza hydropower station [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, December 7/ATA/ Albanian Power Corporation (KESH) reported today on the hydric situation and natural flows in the Drini River cascade that mark the amount of 1780 m3 / s, while hydropower stations of Koman and Vau i Dejës are producing electricity at full capacity.</p>
<p>“The level of the lake in the Fierza hydropower station is 271 m, while the maximum quota is 296 m. The level of the lake of the Koman hydropower station is 173.42 m, while the maximum quota is 175.5 m. The level of the lake in the hydropower station of Vau i Dejes is 75.36 m, while the maximum quota is 76 m &#8220;, KESH said.</p>
<p>According to KESH, the inflows in the Fierza hydropower station reach 800 m3 / s, in the Koman hydropower station 350 m3 / s and in the Vau i Dejes hydropower station 630 m3/s.</p>
<p>KESH said that for the time being the hydropower stations of Koman and Vau i Dejës are producing electricity at full capacity./a.a/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/12/07/albanian-power-corporation-koman-and-vau-i-dejes-hydropower-stations-are-producing-electricity-at-full-capacity/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Rainfall increases water inflows into Drini cascade</title>
		<link>https://en.ata.gov.al/2021/11/30/rainfall-increases-water-inflows-into-drini-cascade/</link>
					<comments>https://en.ata.gov.al/2021/11/30/rainfall-increases-water-inflows-into-drini-cascade/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Tue, 30 Nov 2021 12:38:54 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[energy]]></category>
		<category><![CDATA[inflow]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=167351</guid>

					<description><![CDATA[TIRANA, November 30/ATA/ Albanian Power Corporation (KESH) informed today that rainfall in recent days have increased inflows into the Drini cascade in the amount of 1220 m3/s, while production is over 10 thousand MWh. &#8220;Natural flows in the Cascade are 1220 m3/s. The level of the lake of the Hydropower station of Fierza is 267.5 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, November 30/ATA/ Albanian Power Corporation (KESH) informed today that rainfall in recent days have increased inflows into the Drini cascade in the amount of 1220 m3/s, while production is over 10 thousand MWh.</p>
<p>&#8220;Natural flows in the Cascade are 1220 m3/s. The level of the lake of the Hydropower station of Fierza is 267.5 m, while the maximum quota is 296 m. The level of the lake of the Koman Hydropower station is 169.7 m, while the maximum quota is 175.5 m. The level of the lake in the Hydropower station of Vau i Dejës is 74.3 m, while the maximum quota is 76 m”, said KESH.</p>
<p>According to the data published at noon on Tuesday by KESH, currently Koman and Vau i Dejës hydropower stations produce 10,150 MWh of energy with full capacity.</p>
<p>&#8220;Fierza is currently not producing any energy so that to accumulate water inflows and increase the energy reserve&#8221;, KESH said. /j.p/p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/11/30/rainfall-increases-water-inflows-into-drini-cascade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>PM Rama: Work on Black Drin River new bridge is underway</title>
		<link>https://en.ata.gov.al/2021/10/15/pm-rama-work-on-black-drin-river-new-bridge-is-underway/</link>
					<comments>https://en.ata.gov.al/2021/10/15/pm-rama-work-on-black-drin-river-new-bridge-is-underway/#respond</comments>
		
		<dc:creator><![CDATA[Pandi Skaka]]></dc:creator>
		<pubDate>Fri, 15 Oct 2021 07:35:11 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[bridge]]></category>
		<category><![CDATA[Drin]]></category>
		<category><![CDATA[Rama]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=163435</guid>

					<description><![CDATA[TIRANA, October 15 /ATA/- Prime Minister Edi Rama posted photos in the social media showing the construction site at the new bridge over Black Drin River in Kukës. PM Rama said that work is underway for the construction of this bridge over the Drin River in Kukës, part of the Durrës-Kukës-Morin highway. &#8220;Here’s a view [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, October 15 /ATA/- Prime Minister Edi Rama posted photos in the social media showing the construction site at the new bridge over Black Drin River in Kukës.</p>
<p>PM Rama said that work is underway for the construction of this bridge over the Drin River in Kukës, part of the Durrës-Kukës-Morin highway.</p>
<p>&#8220;Here’s a view of the work that goes on for building the new bridge of Drin i Zi River in Kukës&#8221;, said PM Rama.</p>
<p>The bridge will replace the existing one over the Drin i Zi River, but shifting about 100 meters to its eastern side.</p>
<p>The bridge will have a length of about 350 m and will be an architectural work of art, with two concrete foundations on the shores of the lake, a metal construction with a large arch./p.s./</p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/10/15/pm-rama-work-on-black-drin-river-new-bridge-is-underway/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
