<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>cascade-quota-inflow &#8211; Albanian  Telegraphic  Agency.</title>
	<atom:link href="https://en.ata.gov.al/tag/cascade-quota-inflow/feed/" rel="self" type="application/rss+xml" />
	<link>https://en.ata.gov.al</link>
	<description>News Agency</description>
	<lastBuildDate>Fri, 04 Jun 2021 13:04:04 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Daily production in Drini cascade is estimated 21 740 MWh, inflows at 310 m3/s</title>
		<link>https://en.ata.gov.al/2021/06/04/daily-production-in-drini-cascade-is-estimated-21-740-mwh-inflows-at-310-m3-s/</link>
					<comments>https://en.ata.gov.al/2021/06/04/daily-production-in-drini-cascade-is-estimated-21-740-mwh-inflows-at-310-m3-s/#respond</comments>
		
		<dc:creator><![CDATA[Sonila Mehmeti]]></dc:creator>
		<pubDate>Fri, 04 Jun 2021 12:59:48 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Flash News]]></category>
		<category><![CDATA[News from Albania]]></category>
		<category><![CDATA[cascade-quota-inflow]]></category>
		<guid isPermaLink="false">http://en.ata.gov.al/?p=149956</guid>

					<description><![CDATA[TIRANA, June 4 /ATA/ The Albanian Power Corporation (KESH) informed on Friday that inflows in the Drini cascade are estimated at about 310 m3 /s, while the maximum electricity production is 21 740 MWh. &#8220;Natural flows in the Cascade are 420 m3 /s. The level of the lake at Fierza HPP is 296.24 m, while [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>TIRANA, June  4  /ATA/ The Albanian Power Corporation (KESH) informed on Friday that inflows in the Drini cascade are estimated at about 310 m3 /s, while the maximum electricity production is 21 740 MWh.</p>
<p>&#8220;Natural flows in the Cascade are 420 m3 /s. The level of the lake at Fierza HPP  is 296.24 m, while the maximum quota is 296 m. The level of the Koman HPP lake is 172.27 m, while the maximum quota is 175.5 m. The level of the lake at Vau i Dejës HPP is 73.81 m, while the maximum quota is 76 m, ” KESH reports.</p>
<p>According to the data published at noon on Friday by KESH, the daily production in Fierza HPP is 8590 MWh, in Koman 8830 MWh and in Vau I Dejës 4320 MWh.<br />
/e.xh/j.p/sm/</p>
]]></content:encoded>
					
					<wfw:commentRss>https://en.ata.gov.al/2021/06/04/daily-production-in-drini-cascade-is-estimated-21-740-mwh-inflows-at-310-m3-s/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
