15.4 C
Tirana
16-10-26
Home Economy

PM Rama: Work on Black Drin River new bridge is underway

TIRANA, October 15 /ATA/- Prime Minister Edi Rama posted photos in the social media showing the construction site at the new bridge over Black Drin River in Kukës.

PM Rama said that work is underway for the construction of this bridge over the Drin River in Kukës, part of the Durrës-Kukës-Morin highway.

“Here’s a view of the work that goes on for building the new bridge of Drin i Zi River in Kukës”, said PM Rama.

The bridge will replace the existing one over the Drin i Zi River, but shifting about 100 meters to its eastern side.

The bridge will have a length of about 350 m and will be an architectural work of art, with two concrete foundations on the shores of the lake, a metal construction with a large arch./p.s./

 

Previous articleInstitute of Public Health stated that anti-Covid vaccines are safe
Next articleArmed Forces get training in Air-Ground communication system