Tag: HPP
Drini cascade/KESH: Water flows drop to 490 m3/s, daily production meets...
TIRANA, Feb 19 /ATA/- Albanian Power Corporation (KESH) reported on Friday that the water flows in the Drini River cascade have dropped to...
Drini cascade/ Water flows drop to 500 m3/s, daily production goes...
TIRANA, Feb 18 /ATA/ Albanian Power Corporation (KESH) informed on Thursday that water flows in the Drin River cascade have dropped to...
Rainfall/ Albanian Power Corporation: Discharges from gate of Vau i Dejës...
TIRANA, Jan 30 /ATA/ The Albanian Power Corporation (KESH) is dynamically monitoring the situation in the Drin river cascade amid unstable weather conditions...
Bad weather/ KESH: Total inflows reach 1900 m³/s, water discharges at...
TIRANA, Jan.25 /ATA/- The Albanian Power Corporation (KESH) has continued monitoring of three HPPs on the Drini cascade while managing to accumulate in the...
KESH: Dams safety, total production meets all electricity demand
TIRANA, Jan.24 /ATA/- The Albanian Power Corporation (KESH) is monitoring the rainfall situation by guaranteeing the complete safety of dams, electricity supply to domestic...
Daily energy production/ KESH: Discharges at Vau i Dejës HPP reach...
TIRANA, Jan.22 /ATA/- The Albanian Power Corporation (KESH) stated on Friday that, the monitoring of three HPPs on the Drini cascade is well underway,...
Daily production from Drini basin 26,500 MWH/ KESH: Level of lake...
TIRANA, Jan.21 /ATA/- The Albanian Power Corporation (KESH) stated on Thursday that, the monitoring of three HPPs on the Drini cascade is well underway,...