Daily production in the Drini cascade is estimated at over 13 thousand MWh, inflows at 600 m3 / s

TIRANA,May 2 /ATA/ Albanian Power Corporation (KESH) informed on Sunday

Our news wire service in English and French is reachable through [email protected] or phone number +355 4 22355823.

Existing Users Log In
   
Previous articleConstruction of unauthorized buildings, 13 residents of Dibra face legal proceedings
Next articleLungomare 2 in Vlora / PM Rama: Work goes ahead at a fast pace to welcome tourist season, with a new 5-star public beach