Daily production of electricity at the Cascade of Drin 27 707 MWH/ KESH: Lake level in Vau i Dejës HPP drops to 71.5 m

TIRANA, Jan 20 /ATA/ The Albanian Power Corporation (KESH) announces

Our news wire service in English and French is reachable through [email protected] or phone number +355 4 22355823.

Existing Users Log In
   
Previous articleHistoric transformation of Vora after earthquake, affected families to return to new apartments and neighborhoods with urban standards
Next articleFisheries/ Ekonomi: Production of seafood increased twofold in 2019