Heavy rain/Situation in Drini River cascade is under control; electricity production goes on at full capacity

TIRANA, January 11 /ATA/ The Electricity Corporation (KESH) is continuing

Our news wire service in English and French is reachable through [email protected] or phone number +355 4 22355823.

Existing Users Log In