49% of works at water site in Gjirokastra is realized/Non-stop quality water supply for local residents

TIRANA, September 28 /ATA/ The work is underway at high

Our news wire service in English and French is reachable through [email protected] or phone number +355 4 22355823.

Existing Users Log In